Back
History In The Making
May 26th, 2015
Front yard mulched
December 27
Emulsion text with 400w HPS (vs MH)
December 26
Firepit in the backyard rebuilt
December 25
First Christmas
December 24
Shower adapter for screen cleaning.
December 23
xmas shopping
December 22
Workshop setup in final format (ha)
December 21
Xmas shopping
December 20
Gunnar Shirt run
December 19
Making treats for everyones
December 18
Tree Decorating
December 17
Tree Decorating
December 16
Coated all screens for whatever fun project is next.
December 15
screens reclaimed, roughened, degreased.
December 14
Final Emulsion.
December 13
New screens 160 mesh
December 12
Silkscreen drying rack
December 11
Emulsion calculations take 2
December 10
Emulsion calculations take 1
December 9
Screen cleaning and degreasing.
December 8
Emulsion area setup. light modified. whee!
December 7
Reorganized storage area. rearranged room . bleh
December 6
Closet table, un-closet'ed *boggle*
December 5
Firepit area cleanup
December 4
Dryer cleanout.. holy lintball from hell. quote from roger 'oh! I felt that!'
December 3
dehumidifier leak fixed
December 2
visual project started..
December 1
More random shelves in garage.
November 30
All boots waterproofed :)
November 29
Calculated insulation needed for garage insulation.
November 28
Prepping radial arm table.
November 27
First thanksgiving! :)
I am thankful that Barbara finally has a place to call home.
November 26
Snow Snow Snow! :)
November 25
Total tree cleanup!
November 24
Tree Day!
November 23
Silkscreen frames made.
November 22
Radial Arm Saw Day!
November 21
'final' lawn cleanup (please,please,please).
November 20
Printer stand completed.
November 19
SilkScreen setup.
November 18
Sealed basement workshop windows.
November 17
Leaf Cleanup.
November 16
Gas Blower Day 2. All is fine
November 15
Gas Blower. Day 1
November 14
Snow! Again! no accumulation
November 13
Drafting new firepit from existing firepit stones and bricks, plus stuff left over from from walkway.
November 12
Laser Printer arrived (HP 2550N). attempting to build stand
November 11
Brush Day Part 2! aka, cleanin up the stuff they refused to take.
November 10
Brush Day
November 9
Insulated the pipes. Windows next
November 8
Backyard completed
November 7
Snow! if only short lived!
November 6
Added missing parts to radial arm
November 5
gutters, spot raking
November 4
Wood cut up for brush day
November 3
Pit Mess from back yard
November 2
Last backyard rake and mow.
November 1
Rake all of back yard
October 31
Shelves in shed.
October 30
Halloween! 28 in all!
October 29
Trimmed bushes/branches.
October 28
Weatherproof part B
October 27
Removed electric fence
October 26
Leaves
October 25
Gutters, weeding. Washed windows (not fun)
October 24
Halloween prep
October 23
Weatherproofing part A
October 22
Leaves.
October 21
Weeding/gardening.
October 20
tree trimming, minor.
October 19
Leaves
October 18
storage/inventory. Basement cleanout
October 17
tried new gutter attachment.. Awesome!
October 16
wrote inventory system
October 15
David Died
October 14
Original homeowner stopped by for a visit
October 13
Pappy, Gary, Danny, Deb visited
October 12
Bulk items out. wood, drywall, shelves, cabinets, lighting.
October 11
Downstairs bedrooms done.
October 10
Dresser - 4th coat poly
October 9
Dresser - finish
Drywalled sink area
October 8
Dresser
October 7
Dresser
October 6
Dresser - Prep
October 5
Cabinet - finished (needs 3 days cure)
October 4
Cabinet
October 3
Cabinet
October 2
Cabinet
October 1
Cabinet - patched, sanded, bottom fixed.
September 30
Cabinet - patched, sanded, bottom fixed.
backs of doors painted.
September 29
plumber - double backflow valve.
cabinet apart, stripped of parts. cleaned
September 28
cabinet start/stop
September 27
wired downstairs
September 26
storage table
electrician came
September 25
garage cleanup
September 24
stand for storage
September 23
Icemaker finish.
tools
fixtures
September 22
Shed mower table
September 21
random house stuff (garage, sewing)
September 20
workshop moved. all crates down
Kenny Died
September 19
cement/window wells done.
September 18
sink finish.
September 17
closet table
sink knobs on.
September 16
closet table
sink part 3
September 15
sink
pre-shed shelf
September 14
garage cleanup
September 13
prep sinkwork
September 12
shelf
September 11
faucet part 2
September 10
nothing
September 9
stairs. slight try.
September 8
cementing part 2
sink faucet downstairs
me boxes down
September 7
painting
September 6
cementing
September 5
sink came
September 4
Curtins
September 3
hotwater heater
September 2
curtins stuff. crates down
September 1
kitchen sink
front door
bottom step
prep hotwater/icemaker
August 31
pantry shelves
utility sink purchased
August 30
replaced 20 lightbulbs with cfls
August 29
patched all airholes/spaces with foam
August 28th
patched driveway part 2
August 27th
Waterline finished
August 26
Driveway finished
August 25
Comcast finish
August 24
garage door
August 23
found out no comcast
August 22
Installed doorbell
August 21
ran waterline
August 20
ran cables, wired basement
August 19
Started fishing for comcast lines
August 18
Ed died
August 17
More unpacking
August 16
More unpacking
August 15
Moved in. turned all the heaters off.. not sure why heat was on in every room.